Express track · Fast turnaround

Express exhibition stands — when the fair is weeks away

A typical custom stand takes 4–8 weeks. When you don't have that, we run an express track: in extreme cases a complete custom stand is designed, built and installed in as little as two weeks.

It works because nothing leaves our hands — design, CNC, metal, joinery, print, lighting, transport and assembly all happen in our own Berlin workshop, with our own fleet and crew. No subcontractor queues. Built by hand, installed by morning.

Send your deadline
Proof

77 metres of rigging. One week.

For Atlas at SBC Summit Lisbon we designed, produced and installed seventy-seven metres of overhead rigging lightbox structure in a single week, with zero room for error. Tight planning, the right technical approach and fast, coordinated execution delivered the full structure on time. Read the case.

Why we can move fast

No queue for someone else's workshop

01Seven production lines, one roofCNC, laser, UV print, plotter, metalwork, joinery and large-format 3D printing run in parallel in Berlin.
02Own fleet & installation crewWe drive the stand to the fair ourselves and assemble it overnight if the schedule demands it.
03Direct line to the workshopYou talk to the people who build — by email or WhatsApp, in English, German or Ukrainian.
04Reuse instead of rebuildExisting structures can be adapted: the NUX Gaming stand grew from 3 × 5 m to 5 × 8 m by reusing its structure.
05Honest feasibility check firstBefore anything else we tell you whether your date is realistic — and what to simplify if it is tight.
How express works

From brief to the show floor

01Brief, size & dateSend what you have: fair name, stand size, deadline, references or a finished design.
02Feasibility & itemised quoteA clear answer on timing and an itemised price.
03Design freezeOne round of decisions — the faster it is fixed, the faster we build.
04Parallel productionStructure, graphics and lighting are produced at the same time in our workshop.
05Delivery & assemblyOwn transport and crew — at the venue, ready for opening.
Built fast, built right

Recent stands

Fairs we build for: ICE Barcelona · SiGMA Malta & Rome · SBC Summit Lisbon · IGB & iGB Affiliate London — and trade fairs anywhere in the EU. How we manufacture · Express event decor

FAQ

Questions, answered

How fast can you build a custom exhibition stand?

Typically 4–8 weeks from approved design. On our express track, in extreme cases a stand can be built in as little as two weeks — it depends on size and complexity.

What helps you move fastest?

A finished design or a clear brief, the stand size and hall rules, and graphics files early. The quicker the design is frozen, the quicker we build.

Can you adapt or reuse an existing stand?

Yes. We can rework and extend existing structures — the NUX Gaming stand was scaled from 3 × 5 m to 5 × 8 m by reusing its structure.

Do you deliver and install outside Germany on short notice?

Yes. With our own fleet and installation crew we deliver and assemble anywhere in the EU.

How is an express project quoted?

Like every project: an itemised quote, so you see exactly what each element costs. Send the deadline with your brief and we will tell you what is realistic.