A typical custom stand takes 4–8 weeks. When you don't have that, we run an express track: in extreme cases a complete custom stand is designed, built and installed in as little as two weeks.
It works because nothing leaves our hands — design, CNC, metal, joinery, print, lighting, transport and assembly all happen in our own Berlin workshop, with our own fleet and crew. No subcontractor queues. Built by hand, installed by morning.
For Atlas at SBC Summit Lisbon we designed, produced and installed seventy-seven metres of overhead rigging lightbox structure in a single week, with zero room for error. Tight planning, the right technical approach and fast, coordinated execution delivered the full structure on time. Read the case.





Fairs we build for: ICE Barcelona · SiGMA Malta & Rome · SBC Summit Lisbon · IGB & iGB Affiliate London — and trade fairs anywhere in the EU. How we manufacture · Express event decor
Typically 4–8 weeks from approved design. On our express track, in extreme cases a stand can be built in as little as two weeks — it depends on size and complexity.
A finished design or a clear brief, the stand size and hall rules, and graphics files early. The quicker the design is frozen, the quicker we build.
Yes. We can rework and extend existing structures — the NUX Gaming stand was scaled from 3 × 5 m to 5 × 8 m by reusing its structure.
Yes. With our own fleet and installation crew we deliver and assemble anywhere in the EU.
Like every project: an itemised quote, so you see exactly what each element costs. Send the deadline with your brief and we will tell you what is realistic.
Send the fair, the stand size and the date first — we check feasibility and tell you honestly what can be done.
Send your deadline